IM* Hybrid V2: Difference between revisions
From Fen Spinner Wiki
More actions
| Line 19: | Line 19: | ||
* 2x [[Edding 661]] (caps) | * 2x [[Edding 661]] (caps) | ||
* 2x [[Pilot Opt Shaker|Pilot Opt]] (grips) | * 2x [[Pilot Opt Shaker|Pilot Opt]] (grips) | ||
* 2x[[Crayola SuperTips]] (body) | * 2x [[Crayola SuperTips]] (body) | ||
* 3x [[O-ring]] | * 3x [[O-ring]] | ||
** The original uses 3 with different colors. | ** The original uses 3 with different colors. | ||
Latest revision as of 23:34, 22 May 2025
The IM* Hybrid V2 is a Double sided mod made by VoreTex for Gollumsk8.
Construction
Parts needed
List from the pictures below:
- 2x Anyball (grip)
- 2x Pilot Dr. Grip (tips)
- 2x Edding 661 (caps)
- 2x Pilot Opt (grips)
- 2x Crayola SuperTips (body)
- 3x O-ring
- The original uses 3 with different colors.
- A body to connect both Supertips.
Text tutorial
Preparation
- Cut after the 3rd dimple of both Opt grips.
- Cut ~1.5 cm from the front of both Supertip body.
- Cut ~3.7 cm from tht back of both Edding 661 caps.
Assembly

- Put the Dr.grip tip inside the flat extremity of Edding cap.
- Add the Opt grip onto the Edding cap.
- Overgrip the Opt grips with whole Anyball grips, the side without the small ring should have ~2 stripes on the Edding body.

- Push the Edding cap over the front side of Supertip barrel.
- Repeat on another Supertip barrel.
- Add 3 O-ring on the connector and connect the 2 mod basis.